The method
Why 27: a cubic yard is a 3 ft cube, and 3 × 3 × 3 = 27 cubic feet. Everything else is unit hygiene:
- Length and width in feet (inches ÷ 12, yards × 3, metres ÷ 0.3048).
- Depth in feet too — this is the step that gets skipped. Use the table below.
- Divide the resulting cubic feet by 27.
| Depth | In feet | Yards over 100 sq ft |
|---|---|---|
| 1 in | 0.083 ft | 0.31 yd³ |
| 2 in | 0.167 ft | 0.62 yd³ |
| 3 in | 0.25 ft | 0.93 yd³ |
| 4 in | 0.333 ft | 1.23 yd³ |
| 6 in | 0.5 ft | 1.85 yd³ |
| 12 in | 1 ft | 3.70 yd³ |
Worked examples
Mulch bed 8 × 4 ft, 12 in of material: 8 × 4 × 1 = 32 ft³ ÷ 27 = 1.19 yd³.
Driveway area 20 × 10 ft at 6 in: 20 × 10 × 0.5 = 100 ft³ ÷ 27 = 3.70 yd³.
Round bed, 12 ft across, 1 ft deep: area = π × 6² = 113.1 sq ft; × 1 ft = 113.1 ft³ ÷ 27 = 4.19 yd³. For circles, replace length × width with π × (diameter ÷ 2)² and keep everything else the same.
The cubic yard calculator runs all three of these with its unit selectors, if you want to check your own figures against it.
The four classic mistakes
- Depth left in inches. Multiplying 20 × 10 × 6 (inches!) gives 1,200 "ft³" and a 44-yard order for a 3.7-yard job. If your answer looks enormous, this is why.
- Dividing by 9 instead of 27. 9 converts square feet to square yards (area). Volume needs 27. Mixing them up over-orders by 3×.
- Forgetting compaction. The formula gives the finished, in-place volume. Loose soil and gravel compact 10–20%, so order that much more — or use the material calculators, which carry an extra/settling field.
- One depth for uneven ground. Measure in several spots and average. A 1 in average error over 200 sq ft is about 0.6 yd³.
Checking a delivered pile
A dumped load is a cone, not a cube: volume = π × radius² × height ÷ 3. A pile 12 ft across and 3 ft high is π × 36 × 3 ÷ 3 ≈ 113 ft³ ≈ 4.2 yd³ — cones always look smaller than the same volume in a box, so measure before you complain.
Where to go next
- Gravel Calculator — yards plus tons.
- Mulch Calculator — yards plus bag counts.
- Concrete Calculator — yards plus bags and waste, for the material where running short hurts most.